S-34.1, r. 3 - Regulation respecting petroleum exploration, production and storage licences, and the pipeline construction or use authorization

Full text
129. The authorization holder must start the pipeline construction work not later than 12 months after obtaining the last authorization necessary or the favourable decision from the Régie de l’énergie. The authorization holder who plans on using a pipeline already built must start use it within 6 months.
The Minister may grant an additional period if the holder demonstrates the need therefor.
O.C. 1253-2018, s. 129.
In force: 2018-09-20
129. The authorization holder must start the pipeline construction work not later than 12 months after obtaining the last authorization necessary or the favourable decision from the Régie de l’énergie. The authorization holder who plans on using a pipeline already built must start use it within 6 months.